Skip to content
ProjMan
How it works

From first handshake to verified credential

Six steps take a worker from a QR code exchange on-site to a portable, evidence-backed professional record.

01

Register

Self-registration with government-backed credentials — driver's licence or equivalent ID verification gets you a trusted digital identity in minutes.

02

Introduction

Meet on-site, scan a QR code business card, and exchange verified professional details instantly — no paper, no typos.

03

Job Award

A project-specific invitation formally engages you to the job, linking your identity to that project's evidence chain.

04

Work

Daily on-site evidence capture: tick the task on site, and the server timestamps and hashes the record when it syncs.

05

Verify

The multi-party chain confirms the work: Foreperson, Supervisor, and Inspector each add independent verification where required.

06

Credential

A portable attestation is emitted to VeriTrade — a verified line in a career history that follows you, not your last employer.

Two tools, one project record

On site and in the office

On site

The ProjMan app

On your phone or tablet, where the work happens.

  • Pair a device and introduce trade contacts by QR code
  • Run inspection checklists and hold points
  • Capture photos, signatures and diary entries
  • Keep working offline; records sync when you're back in coverage
In the office

The ProjMan web portal

At your desk, where the project is run.

  • Review site evidence and quality records
  • Manage progress claims and the programme
  • See every project on one dashboard
  • Accounting runs through TalkPOS, with import/export to Xero, MYOB and QuickBooks. Coming soon.
The 18-Stage Lifecycle Explorer

Walk through a project stage by stage

Click any stage to see what happens on-site, who’s involved, and what evidence it produces.

OriginationDesign & ApprovalsConstructionClose-outHold point
Stage 1 · Origination

Ingestion

Project Manager creates the project — client details, site address, and scope are captured as the single source of truth.

On-site action

N/A — project owner action

Evidence captured

Signed engagement record (site GPS anchor: coming soon)

Case study

Rivervale: pivoting from high-rise to townhouse mid-program

When a Perth infill project pivoted from a high-rise concept to a townhouse subdivision mid-planning, the delivery team needed to re-sequence stages without losing the compliance trail already captured. ProjMan's stage-based model let them re-map the program in days, keeping every piece of already-captured evidence intact and audit-ready.

Read the full case study

See it work on your next project